Daily Report #48

listeners,

In case you want to listen.

Tomorrow. To the constructor to pay and get the fabricated emergency helmet together with the attachment that will help to control the tiller through lines in the cockpit. The amount is 2000 times a quarter to the organ player. Small beer for the yacht owner who usually showers under the flowing pecunia.
Then we will see how the assembly of the reduction box is progressing. Cost? Less than getting a new one but maybe not too much off. 12000 quarters.
Small beer. My God. Just been to the boucanier, our favorite pub. Big beer. Roughly 96 quarters. I'm hitting a little too many keys right now.
We also have an appointment with the hairdresser. Haven't seen an organ player yet.
Than;
Replacing the halyard, laying the electric cable for the 12V system, opening the forecastle and airing/cleaning it, checking the diesel oil level, checking the oil level in the winch system, mast inspection, changing the steering gear oil, changing the generator oil and filter, buying the victual oil, checking the navigation lights, cleaning up (ship), installing pins in the hydrovane, preparation for the voyage.
And Wednesday; install reduction box, assemble steering position, test steering system.
Installed a new tap line today, connected the gas bottle to the existing system and did quite a lot of shopping. More than 4000 quarters.
Incredible actually.
But the organ still plays.
A quarter for the organ player.

Bye.

Tony and Mark